Napa County · Wine country construction

Napa Valley Lifting: Tanks, Rebuilds and Retrofits

In Napa County the cranes follow the wine. Stainless fermentation tanks get set into new cellars, steel frames go up for production buildings and tasting rooms, and barrels, presses and bottling lines get moved between harvests. Add a decade of wildfire recovery and the lessons of the 2014 South Napa earthquake, and there is steady lifting work up and down the valley from American Canyon to Calistoga. This page is for the operators, riggers and signal persons who do it and want to prepare for national certification exams online.

Enroll

Reviewed · Our research standards

Rebuilding after the Glass Fire

The Glass Fire in the fall of 2020 burned more than 67,000 acres and damaged or destroyed close to 30 Napa wineries and vineyards, according to local reporting at the time. Castello di Amorosa lost the farmhouse that held a production facility; Burgess, Newton, Signorello and others took heavy losses. Rebuilding has run for years since, with permits approved for projects such as new hospitality buildings and expanded wine caves near Calistoga.

Recovery work like that is a mix of demolition, new steel, precast and tank sets on sloped sites, often with vineyards and finished structures close by. It rewards an operator who can plan a swing path carefully and a rigger who can balance an awkward, top-heavy tank.

Lessons from the 2014 earthquake

The August 2014 South Napa earthquake shook downtown Napa hard, damaging historic brick and stone buildings and knocking barrels off racks in cellars across the south valley. Repairs, bracing and seismic strengthening of older commercial buildings followed, and engineers now pay closer attention to how heavy tanks and racks are anchored.

For crane crews, that means more retrofit picks inside built-up blocks: steel moment frames lowered through roof openings, new braces flown in over occupied neighbors, and careful coordination with a qualified signal person when the operator cannot see the landing.

Harvest season and the work calendar

Many wineries want new equipment set before the grapes come in, so late spring and summer can be crowded with lifts, while harvest itself pushes construction to the edges. Valley heat on summer afternoons matters for crew safety and hydraulic temperatures, and winter rain turns vineyard roads and unpaved pads soft. Highway 29 is a two-lane road for much of its length, so oversize loads and crane mobilizations are planned around traffic.

Tank sets in particular deserve respect. A tall, empty stainless tank is light for its size but catches wind like a sail, and its lifting lugs are rated for specific sling angles. Riggers who know how to read the manufacturer's lifting instructions, choose spreader bars and plan a controlled tip-up from horizontal to vertical keep the tank and the cellar wall intact. That skill transfers to cooling towers, silos and other tall, thin loads on any job.

No local license, one state rule

You will not find a Napa crane permit for operators. What counts is Cal/OSHA: for covered mobile and tower cranes, Title 8 calls for a valid certificate from an accredited certifier that names the crane type, plus a medical exam and a hands-on test along the way. The requirements guide covers the details and the exemptions for smaller units.

Questions people ask

Do winery maintenance staff who run a small truck crane need certification?

It depends on the crane's boom length and rated capacity and on the type of work. Units below the Title 8 thresholds may be exempt from the certificate but still require training. Check the requirements guide or ask your employer's safety lead.

How close is the nearest practical exam?

Certifiers run practical exams at approved sites that change through the year. Napa crews usually look to the wider Bay Area or Sacramento region; confirm current dates with the certifying body.

Can a small winery construction crew enroll together?

Yes. Company enrollment lets several people study at their own pace. Submit the form on the get started page and an advisor will follow up.

Is the study material specific to wine country?

The courses cover national exam content such as load charts, rigging, signals and safety rules. You apply it to tanks, steel and cellar equipment yourself, and the practice questions help you check your understanding before the test.

Where these facts come from (5)

Prep that fits this work

  • Mobile Crane

    Online study for the NCCCO mobile crane Core written exam and the LAT, TLL or TSS specialty that matches your machine, framed around how Cal/OSHA actually checks operators on California jobs.

  • Articulating Crane

    Study for the NCCCO articulating boom crane written exams online, with the California size limits that decide whether a material delivery truck needs a certified operator at all.

  • Rigger II

    Move from following a rigging plan to building one. This course prepares you for the NCCCO Rigger Level II exams: estimating weight, locating center of gravity, calculating sling tension and choosing gear for level and rotating lifts.

  • Signalperson

    Study the standard hand signals, voice procedures and crane behavior behind the NCCCO Signalperson credential, and learn how a third-party certificate fits the Option 1 path in California's signal person rule.

Towns and cities in Napa County

Close by

Line up your California crane exam prep

Share the card you need, the crane you run and the part of California you work in. An enrollment advisor writes back with a course match and a plan for booking your written and hands-on exams.

  • Lessons and practice questions open around the clock
  • Built for the NCCCO written tests Title 8 relies on
  • Advice on scheduling the practical exam near you

Ask about enrollment

A short form. Your details are used only to reply to you.